ITAC Assessment: GT0187
ITAC logo
ITAC Assessment: GT0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SCATTER RUGS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $1
M
to 5
M
# of Employees 125
Plant Area
n/a
Annual Production 3,900
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,738 733,880
kWh
Natural Gas $176,250 33,512
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $6,140 $1,200 - $6,140
-
MMBtu
02 2.4133: Use most efficient type of electric motors $1,977 $22,034 $1,977
30,481
kWh
-
03 2.5191: Modify dye beck $1,338 $600 - $1,338
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $14,618 $24,000 - $14,618
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $8,193 $500 - $8,193
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $2,160 $1,088 - $2,160
-
MMBtu
07 2.2122: Install / repair insulation on condensate lines $172 $138 - $172
-
MMBtu
TOTAL RECOMMENDED $34,598 $49,560 $1,977
30,481
kWh
$32,621
-
MMBtu
TOTAL IMPLEMENTED $17,933 $46,634 $1,977
30,481
kWh
$15,956
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs