ITAC Assessment: TP0006
ITAC logo
ITAC Assessment: TP0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Assembly of Rapid Protype Production Machines
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 115
pieces
Production Hrs. Annual 3,624
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,562 1,530,774
kWh
Electricity Demand $44,170 3,297
kW-mo/yr
Electricity Fees $2,743 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,798

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $6,461 $4,589 $6,461
200,762
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $40,088 $53,410 $25,446
790,152
kWh
$14,642
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,550 $24 $856
25,791
kWh
$694
-
kW-mo/yr
04 2.7124: Make a practice of turning off lights when not needed $2,787 $7,300 $918
28,429
kWh
$1,869
-
kW-mo/yr
TOTAL RECOMMENDED $50,886 $65,323 $33,681
1,045,134
kWh
$17,205
-
kW-mo/yr
TOTAL IMPLEMENTED $10,798 $11,913 $8,235
254,982
kWh
$2,563
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs