| Assessment Year | 1983 |
|---|---|
| Principal Product | ENGINEERED PLASTICS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 173 |
| Plant Area |
n/a
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $392,554 | 8,128,077 |
kWh
|
$0.048 |
| Natural Gas | $53,072 | 10,031 |
MMBtu
|
$5.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $78,580 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.4114: Replace city water with recycled water via cooling tower | $9,050 | $1,200 |
$1,800
36,928
kWh
|
- | $7,250 | |
| 02 | 3.4151: Minimize water usage | $8,324 | $3,000 |
$8,324
355,510
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,683 | $4,700 |
$4,683
96,717
kWh
|
- | - | |
| 04 | 2.3191: Use demand controller or load shedder | $11,993 | $9,000 |
$11,993
-
kWh
|
- | - | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $21,913 | $97,700 |
$21,913
453,693
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,729 | - |
$1,729
35,756
kWh
|
- | - | |
| 07 | 2.7245: Use direct air supply to exhaust hoods | $11,340 | $9,000 | - |
$11,340
-
MMBtu
|
- | |
| 08 | 2.2515: Use optimum thickness insulation | $9,548 | $8,200 | - |
$9,548
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $78,580 | $132,800 |
$50,442
978,604
kWh
|
$20,888
-
MMBtu
|
$7,250 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs