Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product ENGINEERED PLASTICS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 173
Plant Area
n/a
Annual Production 4,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $392,554 8,128,077
kWh
Natural Gas $53,072 10,031
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4114: Replace city water with recycled water via cooling tower $9,050 $1,200 $1,800
36,928
kWh
- $7,250
02 3.4151: Minimize water usage $8,324 $3,000 $8,324
355,510
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,683 $4,700 $4,683
96,717
kWh
- -
04 2.3191: Use demand controller or load shedder $11,993 $9,000 $11,993
-
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $21,913 $97,700 $21,913
453,693
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $1,729 - $1,729
35,756
kWh
- -
07 2.7245: Use direct air supply to exhaust hoods $11,340 $9,000 - $11,340
-
MMBtu
-
08 2.2515: Use optimum thickness insulation $9,548 $8,200 - $9,548
-
MMBtu
-
TOTAL RECOMMENDED $78,580 $132,800 $50,442
978,604
kWh
$20,888
-
MMBtu
$7,250
TOTAL IMPLEMENTED - - - - -