Assessment Year | 2001 |
---|---|
Principal Product | Personal Care/Hygienic Film |
NAICS |
n/a
|
SIC | 3079: |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
94,000
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $432,729 | 6,336,000 |
kWh
|
$0.068 |
Electricity Demand | $83,399 | 13,279 |
kW-mo/yr
|
$6.28 |
Natural Gas | $25,448 | 2,533 |
MMBtu
|
$10.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,711 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,514 | $2,000 | - |
$12,514
-
kW-mo/yr
|
- | |
02 | 2.2511: Insulate bare equipment | $7,197 | $323 |
$6,581
96,782
kWh
|
$616
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $5,050 | $109 |
$4,611
67,814
kWh
|
$439
-
kW-mo/yr
|
- | |
04 | 2.2625: Chill water to the highest temperature possible | $7,807 | - |
$7,129
104,832
kWh
|
$678
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $986 | $1,280 |
$804
11,827
kWh
|
$182
-
kW-mo/yr
|
- | |
06 | 3.1162: Use less wasteful packaging | $9,000 | $7,500 | - | - |
$9,000
-
lb
|
|
TOTAL RECOMMENDED | $42,554 | $11,212 |
$19,125
281,255
kWh
|
$14,429
-
kW-mo/yr
|
$9,000
-
lb
|
||
TOTAL IMPLEMENTED | $19,711 | $2,323 |
$6,581
96,782
kWh
|
$13,130
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs