ITAC Assessment: GT0173
ITAC logo
ITAC Assessment: GT0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product WOVEN FABRIC
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 6,250,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $465,779 10,174,092
kWh
Natural Gas $68,269 15,029
MMBtu
Fuel Oil #2 $8,041 1,074
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,420 $50 - $1,420
-
MMBtu
02 2.3191: Use demand controller or load shedder $7,234 $9,000 $7,234
-
kWh
-
03 2.4133: Use most efficient type of electric motors $41,600 $143,600 $41,600
908,558
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,200 $1,000 $2,200
48,652
kWh
-
05 2.2135: Repair and eliminate steam leaks $1,455 $120 - $1,455
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,530 $600 $9,530
208,382
kWh
-
TOTAL RECOMMENDED $63,439 $154,370 $60,564
1,165,592
kWh
$2,875
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs