ITAC Assessment: GT0167
ITAC logo
ITAC Assessment: GT0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SYNTHETIC CARPET YARN
NAICS
n/a
SIC 2284: Thread Mills
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $913,979 21,525,499
kWh
Natural Gas $810,731 189,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,320 $16,770 $14,320
337,046
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $10,562 $50 - $10,562
-
MMBtu
03 2.1232: Keep boiler tubes clean $19,840 $20,000 - $19,840
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $12,600 $20,000 $12,600
521,688
kWh
-
05 2.4133: Use most efficient type of electric motors $39,940 $149,075 $39,940
939,918
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $1,330 $1,000 $1,330
31,360
kWh
-
07 2.3191: Use demand controller or load shedder $10,790 $9,000 $10,790
-
kWh
-
TOTAL RECOMMENDED $109,382 $215,895 $78,980
1,830,012
kWh
$30,402
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs