ITAC Assessment: GT0166
ITAC logo
ITAC Assessment: GT0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product AUTOMOBILE MOULDING
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,813 2,390,387
kWh
Natural Gas $54,396 11,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,111 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2514: Cover open tanks $15,260 $6,300 - $15,260
-
MMBtu
02 2.4133: Use most efficient type of electric motors $7,800 $21,480 $7,800
118,113
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,300 $4,538 $6,300
95,545
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $4,570 $200 $(-330.0)
(-4,982)
kWh
$4,900
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,811 $500 - $1,811
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,370 $127 $145
2,052
kWh
$1,225
-
MMBtu
TOTAL RECOMMENDED $37,111 $33,145 $13,915
210,728
kWh
$23,196
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs