ITAC Assessment: GT0162
ITAC logo
ITAC Assessment: GT0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product TUFTED CARPETS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area
n/a
Annual Production 27,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,003 3,078,839
kWh
Natural Gas $530,184 126,234
MMBtu
Fuel Oil #6 $35,384 8,536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.2135: Repair and eliminate steam leaks $742 $80 - $696
-
MMBtu
$46
-
MMBtu
02 2.5192: Modify textile dryers $14,952 - - $14,952
-
MMBtu
-
03 2.1232: Keep boiler tubes clean $18,778 $20,000 - $18,778
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $2,008 $12,706 $2,008
46,600
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $219 $500 $219
4,982
kWh
- -
TOTAL RECOMMENDED $36,699 $33,286 $2,227
51,582
kWh
$34,426
-
MMBtu
$46
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs