ITAC Assessment: GT0155
ITAC logo
ITAC Assessment: GT0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SOCKS
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 134
Plant Area
n/a
Annual Production 14,000,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,242 1,157,386
kWh
Natural Gas $58,843 12,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,044 $2,500 - $4,044
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,170 $192 $1,170
18,464
kWh
-
03 2.5191: Modify dye beck $5,192 - - $5,192
-
MMBtu
04 2.2449: Recover heat from exhausted steam, hot air or hot water $5,373 $7,500 - $5,373
-
MMBtu
05 2.2511: Insulate bare equipment $829 $574 $519
8,206
kWh
$310
-
MMBtu
06 2.4133: Use most efficient type of electric motors $588 $466 $588
9,379
kWh
-
07 2.2135: Repair and eliminate steam leaks $176 $40 - $176
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $530 $500 $530
8,499
kWh
-
TOTAL RECOMMENDED $17,902 $11,772 $2,807
44,548
kWh
$15,095
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs