ITAC Assessment: GT0153
ITAC logo
ITAC Assessment: GT0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BED SHEETS,PILLOW CASES
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 1,725,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,072 1,847,011
kWh
Natural Gas $7,718 1,781
MMBtu
LPG $2,598 343
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $4,196 $903 $1,515
67,116
kWh
$2,681
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,545 $625 $2,545
47,479
kWh
-
03 2.3191: Use demand controller or load shedder $2,945 $9,000 $2,945
-
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $6,549 - $6,549
122,216
kWh
-
05 2.6124: Establish equipment maintenance schedule $1,865 $1,860 $1,865
34,877
kWh
-
TOTAL RECOMMENDED $18,100 $12,388 $15,419
271,688
kWh
$2,681
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs