ITAC Assessment: GT0148
ITAC logo
ITAC Assessment: GT0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product BATTERIES
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 180,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,617 7,667,058
kWh
Natural Gas $145,544 33,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,325 $5,549 $3,325
79,132
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $195 $500 $195
4,689
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,080 $833 $3,080
73,271
kWh
-
04 2.2424: Use heat in flue gases to preheat products or materials $16,150 $10,000 - $16,150
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,136 $375 $8,136
193,728
kWh
-
TOTAL RECOMMENDED $30,886 $17,257 $14,736
350,820
kWh
$16,150
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs