ITAC Assessment: GT0145
ITAC logo
ITAC Assessment: GT0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SYNTHETIC COTTON BLENDS
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 385
Plant Area
n/a
Annual Production 216,000
thousand feet
Production Hrs. Annual 7,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $521,863 12,932,005
kWh
Natural Gas $92,936 22,641
MMBtu
Fuel Oil #2 $8,221 1,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,467 $10,573 $7,467
184,936
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,373 - - $5,857
-
MMBtu
$516
-
MMBtu
03 2.4133: Use most efficient type of electric motors $17,822 $72,246 $17,822
441,383
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,955 $50 $4,955
122,802
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $2,787 $1,500 $2,787
69,168
kWh
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,293 $9,000 $16,293
-
kWh
- -
TOTAL RECOMMENDED $55,697 $93,369 $49,324
818,289
kWh
$5,857
-
MMBtu
$516
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs