ITAC Assessment: GT0121
ITAC logo
ITAC Assessment: GT0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product VENDING MACHINE PARTS
NAICS
n/a
SIC 3581: Automatic Vending Machines
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 330,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,063 1,191,970
kWh
Natural Gas $31,111 7,894
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7229: Air condition only space necessary $6,710 $2,169 - $6,710
-
MMBtu
02 2.7261: Install timers and/or thermostats $6,280 $2,000 - $6,280
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $3,493 $5,400 $(-640.0)
(-13,775)
kWh
$4,133
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,683 $762 $2,683
58,030
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $2,259 $7,860 $2,259
48,945
kWh
-
TOTAL RECOMMENDED $21,425 $18,191 $4,302
93,200
kWh
$17,123
-
MMBtu
TOTAL IMPLEMENTED $6,280 $2,000 - $6,280
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs