ITAC Assessment: GT0118
ITAC logo
ITAC Assessment: GT0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product INDUSTRIAL CONTROLS
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,699 1,130,422
kWh
Natural Gas $27,687 6,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7229: Air condition only space necessary $5,952 $573 $1,648
29,308
kWh
$4,304
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,187 $608 $1,187
21,102
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,676 $198 - $1,676
-
MMBtu
TOTAL RECOMMENDED $8,815 $1,379 $2,835
50,410
kWh
$5,980
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs