ITAC Assessment: GT0117
ITAC logo
ITAC Assessment: GT0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CIRCUIT BOARDS, PARTS
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,732
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,260 2,137,456
kWh
Natural Gas $45,133 11,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $1,518 $2,760 $(-12.0)
(-293)
kWh
$1,530
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $7,669 $5,792 $3,702
75,029
kWh
$3,967
-
MMBtu
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $7,298 $1,500 $7,298
148,300
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $310 $500 $310
6,155
kWh
-
TOTAL RECOMMENDED $16,795 $10,552 $11,298
229,191
kWh
$5,497
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs