ITAC Assessment: DS0171
ITAC logo
ITAC Assessment: DS0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Immersion Heaters and Air Intake Heaters
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 74,400
ft2
Annual Production 702,000
pieces
Production Hrs. Annual 3,653
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,691 1,212,485
kWh
Electricity Demand $29,406 4,032
kW-mo/yr
Electricity Fees $2,624 -
Natural Gas $8,743 1,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6232: Install set-back timers $1,550 $2,520 n/a - - $1,550
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $725 $135 n/a $436
12,016
kWh
$289
-
kW-mo/yr
- - - -
03 4.522: Modify storage space to avoid rental of a warehouse $8,400 $740 n/a - - - - $8,400 -
04 4.652: Replace existing equipment with more suitable substitutes $81,647 $52,500 n/a - - - $(-41,780.0) $124,800 $(-1,373.0)
05 4.445: Install equipment to move product $35,780 $7,500 n/a - - - $35,780 - -
06 4.821: Pay bills on time to avoid late fees $143 - n/a - - - - $143 -
TOTAL RECOMMENDED $128,245 $63,395 $436
12,016
kWh
$289
-
kW-mo/yr
$1,550
-
MMBtu
$(-6,000.0) $133,343 $(-1,373.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs