ITAC Assessment: DS0167
ITAC logo
ITAC Assessment: DS0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Air Moving Equipment
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 150,000
ft2
Annual Production 8,400
pieces
Production Hrs. Annual 3,536
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,789 2,179,660
kWh
Electricity Demand $39,173 5,640
kW-mo/yr
Electricity Fees $6,656 -
Natural Gas $65,870 15,767
MMBtu
LPG $11,598 629
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $2,633 $850 - - $2,633
-
MMBtu
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,120 $540 $653
19,930
kWh
$467
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,204 $3,793 $670
20,223
kWh
$534
-
kW-mo/yr
- - - - -
04 2.7135: Install occupancy sensors $257 $216 $257
7,913
kWh
- - - - - -
05 3.2121: Convert to electrostatic powder coating $12,389 $35,000 - - - - - $12,389 -
06 3.8142: Distill contaminated solvents for reuse $3,104 $4,075 - $(-200.0)
-
kW-mo/yr
- $1,767
-
gal
$(-2,080.0) - $3,617
TOTAL RECOMMENDED $20,707 $44,474 $1,580
48,066
kWh
$801
-
kW-mo/yr
$2,633
-
MMBtu
$1,767
-
gal
$(-2,080.0) $12,389 $3,617
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs