ITAC Assessment: AM0642
ITAC logo
ITAC Assessment: AM0642
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Water jetting systems and pumps
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 60,625
ft2
Annual Production 210
pieces
Production Hrs. Annual 7,060
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,063 1,040,832
kWh
Electricity Demand $34,472 6,635
kW-mo/yr
Electricity Fees $4,219 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,225 - - $14,225
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $6,760 $22,800 - $6,760
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $4,950 $560 $4,000
67,940
kWh
$710
-
kW-mo/yr
$100 $140
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,645 $2,652 $2,010
34,200
kWh
$370
-
kW-mo/yr
$120 $145
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,332 $636 $207
3,508
kWh
$30
-
kW-mo/yr
$537 $558
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,230 $500 $1,040
17,700
kWh
$190
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $1,220 $400 $1,220
20,760
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $954 $2,680 $781
13,260
kWh
$173
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $750 $9 $671
11,380
kWh
$79
-
kW-mo/yr
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $171 - $114
1,941
kWh
$57
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,237 $30,237 $10,043
170,689
kWh
$22,594
-
kW-mo/yr
$757 $843
TOTAL IMPLEMENTED $27,477 $7,437 $10,043
170,689
kWh
$15,834
-
kW-mo/yr
$757 $843
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs