| Assessment Year | 1999 |
|---|---|
| Principal Product | Metal Stampings |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
120,000
ft2
|
| Annual Production | 11,087,500
pieces
|
| Production Hrs. Annual | 4,485
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $83,583 | 2,405,041 |
kWh
|
$0.035 |
| Electricity Demand | $43,337 | 6,420 |
kW-mo/yr
|
$6.75 |
| Electricity Fees | $2,227 | - |
|
- |
| Natural Gas | $18,668 | 3,890 |
MMBtu
|
$4.80 |
| LPG | $3,953 | 287 |
MMBtu
|
$13.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,797 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,077 | $438 |
$2,032
58,030
kWh
|
$1,045
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $567 | $259 |
$373
10,551
kWh
|
$194
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $705 | $216 |
$705
20,223
kWh
|
- | - | - | - | |
| 04 | 2.6218: Turn off equipment when not in use | $1,642 | $725 |
$1,642
46,893
kWh
|
- | - | - | - | |
| 05 | 3.6124: Burn waste oil for heat | $1,318 | $1,695 | - | - |
$148
-
MMBtu
|
$1,170
-
gal
|
- | |
| 06 | 4.211: Consider use / purchase of bulk materials where possible | $2,225 | $1,350 | - | - | - | - | $2,225 | |
| 07 | 4.611: Begin a practice of predictive / preventative maintenance | $286 | - | - | - | - | - | $286 | |
| TOTAL RECOMMENDED | $9,820 | $4,683 |
$4,752
135,697
kWh
|
$1,239
-
kW-mo/yr
|
$148
-
MMBtu
|
$1,170
-
gal
|
$2,511 | ||
| TOTAL IMPLEMENTED | $7,797 | $2,772 |
$4,047
115,474
kWh
|
$1,239
-
kW-mo/yr
|
- | - | $2,511 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs