ITAC Assessment: DS0132
ITAC logo
ITAC Assessment: DS0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 175,000
ft2
Annual Production 162,000
thousand feet
Production Hrs. Annual 4,290
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,844 2,027,843
kWh
Electricity Demand $49,027 6,720
kW-mo/yr
Electricity Fees $9,843 -
Natural Gas $9,755 1,853
MMBtu
LPG $11,000 1,035
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $1,316 $1,705 - - - $1,316
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $947 $113 $125
40,152
kWh
$822
-
kW-mo/yr
- - - - -
03 2.3212: Optimize plant power factor $869 $1,750 - - $869 - - - -
04 2.7135: Install occupancy sensors $232 $108 $232
7,620
kWh
- - - - - -
05 2.2511: Insulate bare equipment $2,274 $2,274 $1,705
55,100
kWh
$569
-
kW-mo/yr
- - - - -
06 3.7311: Maintain machines to reduce leaks $2,049 $52 - - - - $2,049
-
lb
- -
07 4.211: Consider use / purchase of bulk materials where possible $5,579 $2,750 - - - - - - $5,579
08 4.444: Install system to collect scrap $13,520 $6,260 - - - - - $13,520 -
09 2.8121: Apply for tax-free status for energy purchases $795 $90 - - - - - - $795
TOTAL RECOMMENDED $27,581 $15,102 $2,062
102,872
kWh
$1,391
-
kW-mo/yr
$869 $1,316
-
MMBtu
$2,049
-
lb
$13,520 $6,374
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs