ITAC Assessment: DS0126
ITAC logo
ITAC Assessment: DS0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Automated Packaging Equipment
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $50
M
to 100
M
# of Employees 550
Plant Area 220,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,638 5,947,245
kWh
Electricity Demand $33,277 16,344
kW-mo/yr
Electricity Fees $4,884 -
Natural Gas $86,330 16,974
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.5316: Contract a wood pallet recycling company $1,040 $160 - - - $1,040
-
lb
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,141 $20 $1,090
26,671
kWh
$51
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $434 $750 $397
9,672
kWh
$37
-
kW-mo/yr
- - -
04 2.1331: Burn a less expensive grade of fuel $27,478 $91,571 - - - - $27,478
05 2.2437: Recover waste heat from equipment $3,077 $6,500 - - $3,077
-
MMBtu
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $34,638 $78,656 $52,600
1,283,412
kWh
$9,082
-
kW-mo/yr
$(-27,044.0)
-
MMBtu
- -
07 4.211: Consider use / purchase of bulk materials where possible $7,897 $1,350 - - - - $7,897
08 4.424: Improve space comfort conditioning $22,680 $270 - - - - $22,680
TOTAL RECOMMENDED $98,385 $179,277 $54,087
1,319,755
kWh
$9,170
-
kW-mo/yr
$(-23,967.0)
-
MMBtu
$1,040
-
lb
$58,055
TOTAL IMPLEMENTED $86,371 $171,267 $54,087
1,319,755
kWh
$9,170
-
kW-mo/yr
$(-27,044.0)
-
MMBtu
- $50,158
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs