Assessment Year | 1999 |
---|---|
Principal Product | Automated Packaging Equipment |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $50 M to 100M |
# of Employees | 550 |
Plant Area |
220,000
ft2
|
Annual Production | 300
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,638 | 5,947,245 |
kWh
|
$0.041 |
Electricity Demand | $33,277 | 16,344 |
kW-mo/yr
|
$2.04 |
Electricity Fees | $4,884 | - |
|
- |
Natural Gas | $86,330 | 16,974 |
MMBtu
|
$5.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $98,385 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.5316: Contract a wood pallet recycling company | $1,040 | $160 | - | - | - |
$1,040
-
lb
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,141 | $20 |
$1,090
26,671
kWh
|
$51
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $434 | $750 |
$397
9,672
kWh
|
$37
-
kW-mo/yr
|
- | - | - | |
04 | 2.1331: Burn a less expensive grade of fuel | $27,478 | $91,571 | - | - | - | - | $27,478 | |
05 | 2.2437: Recover waste heat from equipment | $3,077 | $6,500 | - | - |
$3,077
-
MMBtu
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $34,638 | $78,656 |
$52,600
1,283,412
kWh
|
$9,082
-
kW-mo/yr
|
$(-27,044.0)
-
MMBtu
|
- | - | |
07 | 4.211: Consider use / purchase of bulk materials where possible | $7,897 | $1,350 | - | - | - | - | $7,897 | |
08 | 4.424: Improve space comfort conditioning | $22,680 | $270 | - | - | - | - | $22,680 | |
TOTAL RECOMMENDED | $98,385 | $179,277 |
$54,087
1,319,755
kWh
|
$9,170
-
kW-mo/yr
|
$(-23,967.0)
-
MMBtu
|
$1,040
-
lb
|
$58,055 | ||
TOTAL IMPLEMENTED | $86,371 | $171,267 |
$54,087
1,319,755
kWh
|
$9,170
-
kW-mo/yr
|
$(-27,044.0)
-
MMBtu
|
- | $50,158 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs