ITAC Assessment: DS0122
ITAC logo
ITAC Assessment: DS0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Signing
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 70,606
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,527 911,489
kWh
Electricity Demand $15,294 3,433
kW-mo/yr
Electricity Fees $306 -
Natural Gas $34,506 8,150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,240 $11,085 $2,491
63,892
kWh
$749
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $398 $250 $315
8,206
kWh
$83
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,446 $72 $1,144
29,308
kWh
$302
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $373 $26 $295
7,620
kWh
$78
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $433 $88 $433
14,068
kWh
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,118 $4,750 - - - $1,118
07 3.2176: Increase use of automation $91,520 $15,000 - - $91,520 -
08 3.1191: Change procedures / equipment / operating conditions $20,218 $77,000 - - $20,218 -
TOTAL RECOMMENDED $118,746 $108,271 $4,678
123,094
kWh
$1,212
-
kW-mo/yr
$111,738 $1,118
TOTAL IMPLEMENTED $2,650 $436 $2,187
59,202
kWh
$463
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs