ITAC Assessment: DS0119
ITAC logo
ITAC Assessment: DS0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Cheese and Whey
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 93,875
ft2
Annual Production 50,700,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,331 13,816,823
kWh
Electricity Demand $199,836 28,416
kW-mo/yr
Electricity Fees $(-31,150.0) -
Natural Gas $440,121 137,978
MMBtu
Fuel Oil #6 $187,910 58,685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.6218: Turn off equipment when not in use $1,323 - $1,323
45,721
kWh
- - - - - -
02 2.4221: Install compressor air intakes in coolest locations $985 $1,000 $740
25,498
kWh
$245
-
kW-mo/yr
- - - - -
03 2.1213: Direct warmest air to combustion intake $6,912 $2,400 - - $4,653
-
MMBtu
$2,259
-
MMBtu
- - -
04 2.2628: Utilize a less expensive cooling method $14,505 $15,260 $(-832.0)
(-28,722)
kWh
$(-388.0)
-
kW-mo/yr
- - $9,435
-
Tgal
- $6,290
-
Tgal
05 3.5315: Lease / purchase baler; sell cardboard to recycler $910 $200 - - - - - $910 -
06 3.1191: Change procedures / equipment / operating conditions $20,000 $1,000 - - - - - $20,000 -
TOTAL RECOMMENDED $44,635 $19,860 $1,231
42,497
kWh
$(-143.0)
-
kW-mo/yr
$4,653
-
MMBtu
$2,259
-
MMBtu
$9,435
-
Tgal
$20,910 $6,290
-
Tgal
TOTAL IMPLEMENTED $8,807 $3,600 $740
25,498
kWh
$245
-
kW-mo/yr
$4,653
-
MMBtu
$2,259
-
MMBtu
- $910 -