ITAC Assessment: DS0117
ITAC logo
ITAC Assessment: DS0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Commercial Printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 101,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,877 5,469,519
kWh
Electricity Demand $74,070 9,744
kW-mo/yr
Electricity Fees $22,695 -
Natural Gas $11,443 2,317
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.3212: Optimize plant power factor $3,377 $2,787 - - $3,377 - - -
02 2.3137: Use power during off-peak periods $667 $556 - $667
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $752 $750 $606
22,567
kWh
$146
-
kW-mo/yr
- - - -
04 2.6218: Turn off equipment when not in use $7,856 $2,650 $5,263
194,900
kWh
$2,593
-
kW-mo/yr
- - - -
05 3.8142: Distill contaminated solvents for reuse $10,453 $6,000 $(-121.0)
(-4,396)
kWh
- - $5,980
-
gal
$(-1,008.0) $5,602
06 3.2176: Increase use of automation $27,300 $4,900 - - - - $27,300 -
TOTAL RECOMMENDED $50,405 $17,643 $5,748
213,071
kWh
$3,406
-
kW-mo/yr
$3,377 $5,980
-
gal
$26,292 $5,602
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs