ITAC Assessment: DS0110
ITAC logo
ITAC Assessment: DS0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel Pedestrian Bridges and Grain Bin Hoppers
NAICS
n/a
SIC 3440:
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 69,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 2,444
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,679 804,807
kWh
Electricity Demand $32,784 4,680
kW-mo/yr
LPG $23,535 3,637
MMBtu
Fuel Oil #2 $5,583 834
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,901 $3,030 $880
24,326
kWh
$840
-
kW-mo/yr
- - - $181 - -
02 2.2437: Recover waste heat from equipment $747 $763 - - $747
-
MMBtu
- - - - -
03 2.7261: Install timers and/or thermostats $791 $1,595 - - $791
-
MMBtu
- - - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $960 $4,750 - $(-59.0)
-
kW-mo/yr
- - $648
-
lb
$(-157.0) $528 -
05 3.2121: Convert to electrostatic powder coating $136,736 $12,000 - - - - - $11,558 - $125,178
06 4.211: Consider use / purchase of bulk materials where possible $2,574 $12,130 - - - - - $1,866 - $708
07 3.1191: Change procedures / equipment / operating conditions $7,270 $1,200 - - - $7,270
-
gal
- - - -
TOTAL RECOMMENDED $150,979 $35,468 $880
24,326
kWh
$781
-
kW-mo/yr
$1,538
-
MMBtu
$7,270
-
gal
$648
-
lb
$13,448 $528 $125,886
TOTAL IMPLEMENTED $9,918 $4,993 $880
24,326
kWh
$840
-
kW-mo/yr
$747
-
MMBtu
$7,270
-
gal
- $181 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs