ITAC Assessment: DS0109
ITAC logo
ITAC Assessment: DS0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Cheese and Whey
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 200,000
ft2
Annual Production 65,120,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $494,769 17,177,023
kWh
Electricity Demand $180,778 26,976
kW-mo/yr
Electricity Fees $2,642 -
Natural Gas $709,996 261,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $424,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $417,297

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,776 $13,369 $2,699
93,200
kWh
$1,077
-
kW-mo/yr
- - - -
02 2.4221: Install compressor air intakes in coolest locations $1,907 $1,500 $1,203
41,618
kWh
$704
-
kW-mo/yr
- - - -
03 2.2444: Use hot process fluids to preheat incoming process fluids $10,041 $13,000 - - $10,041
-
MMBtu
- - -
04 3.5316: Contract a wood pallet recycling company $250 $250 - - - - - $250
05 4.114: Add/modify equipment to improve drying process $4,740 $1,500 - - - $4,740
-
lb
- -
06 3.6192: Use a less expensive method of waste removal $3,325 $50 - - - $3,325
-
lb
- -
07 4.441: Install automatic packing equipment $400,359 $200,000 $(-661.0)
(-22,860)
kWh
$(-420.0)
-
kW-mo/yr
- - $401,440 -
TOTAL RECOMMENDED $424,398 $229,669 $3,241
111,958
kWh
$1,361
-
kW-mo/yr
$10,041
-
MMBtu
$8,065
-
lb
$401,440 $250
TOTAL IMPLEMENTED $417,297 $216,250 $542
18,758
kWh
$284
-
kW-mo/yr
$10,041
-
MMBtu
$4,740
-
lb
$401,440 $250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs