ITAC Assessment: DS0108
ITAC logo
ITAC Assessment: DS0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Sprayers and Spray Assemblies
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 103,540
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,350 412,661
kWh
Electricity Demand $32,457 2,280
kW-mo/yr
Electricity Fees $540 -
Natural Gas $25,199 4,731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,821 $15,624 $4,236
57,151
kWh
$3,585
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $323 $230 $323
4,396
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,721 $140 $1,107
14,947
kWh
$614
-
kW-mo/yr
- - -
04 2.6232: Install set-back timers $4,634 $3,465 - - $4,634
-
MMBtu
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,100 $4,750 - - - $1,100
-
lb
-
06 3.5311: Recover and reuse waste material $595 $400 - - - $595
-
lb
-
07 3.1191: Change procedures / equipment / operating conditions $20,800 $500 - - - - $20,800
TOTAL RECOMMENDED $36,994 $25,109 $5,666
76,494
kWh
$4,199
-
kW-mo/yr
$4,634
-
MMBtu
$1,695
-
lb
$20,800
TOTAL IMPLEMENTED $35,894 $20,359 $5,666
76,494
kWh
$4,199
-
kW-mo/yr
$4,634
-
MMBtu
$595
-
lb
$20,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs