| Assessment Year | 1998 |
|---|---|
| Principal Product | Sprayers and Spray Assemblies |
| NAICS |
n/a
|
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
103,540
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $30,350 | 412,661 |
kWh
|
$0.074 |
| Electricity Demand | $32,457 | 2,280 |
kW-mo/yr
|
$14.24 |
| Electricity Fees | $540 | - |
|
- |
| Natural Gas | $25,199 | 4,731 |
MMBtu
|
$5.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,994 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,894 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,821 | $15,624 |
$4,236
57,151
kWh
|
$3,585
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7135: Install occupancy sensors | $323 | $230 |
$323
4,396
kWh
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,721 | $140 |
$1,107
14,947
kWh
|
$614
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.6232: Install set-back timers | $4,634 | $3,465 | - | - |
$4,634
-
MMBtu
|
- | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,100 | $4,750 | - | - | - |
$1,100
-
lb
|
- | |
| 06 | 3.5311: Recover and reuse waste material | $595 | $400 | - | - | - |
$595
-
lb
|
- | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $20,800 | $500 | - | - | - | - | $20,800 | |
| TOTAL RECOMMENDED | $36,994 | $25,109 |
$5,666
76,494
kWh
|
$4,199
-
kW-mo/yr
|
$4,634
-
MMBtu
|
$1,695
-
lb
|
$20,800 | ||
| TOTAL IMPLEMENTED | $35,894 | $20,359 |
$5,666
76,494
kWh
|
$4,199
-
kW-mo/yr
|
$4,634
-
MMBtu
|
$595
-
lb
|
$20,800 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs