ITAC Assessment: IA0523
ITAC logo
ITAC Assessment: IA0523
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Bacon
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 420
Plant Area 85,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,037,055 26,140,065
kWh
Electricity Demand $768,848 63,621
kW-mo/yr
Electricity Fees $19,135 -
Natural Gas $218,953 35,343
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $42,230 $125,850 $28,299
718,250
kWh
$13,931
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,013 $35 $679
17,222
kWh
$334
-
kW-mo/yr
03 2.4131: Size electric motors for peak operating efficiency $1,851 $8,742 $1,098
27,825
kWh
$753
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,390 $5,334 $1,390
35,303
kWh
-
05 2.7135: Install occupancy sensors $540 $1,680 $540
13,723
kWh
-
06 2.7124: Make a practice of turning off lights when not needed $189 $100 $189
4,800
kWh
-
TOTAL RECOMMENDED $47,213 $141,741 $32,195
817,123
kWh
$15,018
-
kW-mo/yr
TOTAL IMPLEMENTED $44,810 $136,372 $30,126
764,598
kWh
$14,684
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings