ITAC Assessment: DS0103
ITAC logo
ITAC Assessment: DS0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Proximity Sensors and Cordsets
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 204
Plant Area 78,000
ft2
Annual Production 1,716,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,470 1,112,251
kWh
Electricity Demand $31,165 4,164
kW-mo/yr
Electricity Fees $4,018 -
Natural Gas $17,985 7,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $3,332 $2,000 - - $3,332 - - -
02 2.4221: Install compressor air intakes in coolest locations $316 $625 $187
6,155
kWh
$129
-
kW-mo/yr
- - - -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $5,343 $4,500 - - - $5,343
-
lb
- -
04 3.5212: Regrind, reuse, or sell scrap plastic parts $1,970 $100 - - - $1,970
-
lb
- -
05 3.1191: Change procedures / equipment / operating conditions $42,882 $32,000 - - - - - $42,882
06 2.6124: Establish equipment maintenance schedule $110 - - - - - $110 -
TOTAL RECOMMENDED $53,953 $39,225 $187
6,155
kWh
$129
-
kW-mo/yr
$3,332 $7,313
-
lb
$110 $42,882
TOTAL IMPLEMENTED $5,728 $2,725 $187
6,155
kWh
$129
-
kW-mo/yr
$3,332 $1,970
-
lb
$110 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs