ITAC Assessment: SD0286
ITAC logo
ITAC Assessment: SD0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product metal products for contruction of buildings
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 4,896
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,314 2,453,558
kWh
Electricity Demand $63,351 7,861
kW-mo/yr
Electricity Fees $3,053 -
Natural Gas $467,790 67,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $480,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,685 $320 $3,820
43,755
kWh
$865
-
kW-mo/yr
- - - - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,802 $4,400 $4,730
54,185
kWh
$1,072
-
kW-mo/yr
- - - - - -
03 2.4239: Eliminate or reduce compressed air usage $1,235 $1,000 $332
3,806
kWh
$903
-
kW-mo/yr
- - - - - -
04 2.3137: Use power during off-peak periods $2,320 - $1,849
21,184
kWh
$471
-
kW-mo/yr
- - - - - -
05 2.7145: Install skylights $6,985 - - - $6,985
-
MMBtu
- - - - -
06 2.4322: Use or replace with energy efficient substitutes $3,250 - - - $3,250
-
MMBtu
- - - - -
07 2.7135: Install occupancy sensors $2,292 - $488
5,595
kWh
$1,804
-
kW-mo/yr
- - - - - -
08 2.6218: Turn off equipment when not in use $262,070 $1,200,000 $213,710
2,448,000
kWh
$48,360
-
kW-mo/yr
- - - - - -
09 3.3131: Use evaporation to concentrate material $540 $300 $540
6,188
kWh
- - - - - - -
10 3.3131: Use evaporation to concentrate material $122,879 $200,000 - - $66,043
-
MMBtu
$2,512
-
Tgal
- $54,324
-
lb
- -
11 4.445: Install equipment to move product $9,000 $3,500 - - - - - $9,000
-
lb
- -
12 3.1191: Change procedures / equipment / operating conditions $28,610 $35,000 - - $8,144
-
MMBtu
- - $20,466
-
lb
- -
13 4.211: Consider use / purchase of bulk materials where possible $20,964 $25,000 - - - - - - $14,724 $6,240
14 4.323: Optimize lot sizes to reduce inventory carrying costs $3,348 $7,000 - - - - $84
-
lb
- $3,264 -
15 4.652: Replace existing equipment with more suitable substitutes $4,380 $3,000 $945
136
kWh
- - $171
-
Tgal
- - $3,264 -
16 4.632: Change operating conditions $2,333 - - - - - - - - $2,333
TOTAL RECOMMENDED $480,693 $1,479,520 $226,414
2,582,849
kWh
$53,475
-
kW-mo/yr
$84,422
-
MMBtu
$2,683
-
Tgal
$84
-
lb
$83,790
-
lb
$21,252 $8,573
TOTAL IMPLEMENTED $33,383 $15,120 $7,974
80,664
kWh
$4,043
-
kW-mo/yr
$3,250
-
MMBtu
$171
-
Tgal
$84
-
lb
$9,000
-
lb
$6,528 $2,333
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs