| Assessment Year | 2002 |
|---|---|
| Principal Product | metal products for contruction of buildings |
| NAICS |
n/a
|
| SIC | 3086: Plastics Foam Products |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
70,000
ft2
|
| Annual Production | 25,000
thousand feet
|
| Production Hrs. Annual | 4,896
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $214,314 | 2,453,558 |
kWh
|
$0.087 |
| Electricity Demand | $63,351 | 7,861 |
kW-mo/yr
|
$8.06 |
| Electricity Fees | $3,053 | - |
|
- |
| Natural Gas | $467,790 | 67,494 |
MMBtu
|
$6.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $480,693 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,383 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,685 | $320 |
$3,820
43,755
kWh
|
$865
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,802 | $4,400 |
$4,730
54,185
kWh
|
$1,072
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $1,235 | $1,000 |
$332
3,806
kWh
|
$903
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 04 | 2.3137: Use power during off-peak periods | $2,320 | - |
$1,849
21,184
kWh
|
$471
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 05 | 2.7145: Install skylights | $6,985 | - | - | - |
$6,985
-
MMBtu
|
- | - | - | - | - | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $3,250 | - | - | - |
$3,250
-
MMBtu
|
- | - | - | - | - | |
| 07 | 2.7135: Install occupancy sensors | $2,292 | - |
$488
5,595
kWh
|
$1,804
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 08 | 2.6218: Turn off equipment when not in use | $262,070 | $1,200,000 |
$213,710
2,448,000
kWh
|
$48,360
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 09 | 3.3131: Use evaporation to concentrate material | $540 | $300 |
$540
6,188
kWh
|
- | - | - | - | - | - | - | |
| 10 | 3.3131: Use evaporation to concentrate material | $122,879 | $200,000 | - | - |
$66,043
-
MMBtu
|
$2,512
-
Tgal
|
- |
$54,324
-
lb
|
- | - | |
| 11 | 4.445: Install equipment to move product | $9,000 | $3,500 | - | - | - | - | - |
$9,000
-
lb
|
- | - | |
| 12 | 3.1191: Change procedures / equipment / operating conditions | $28,610 | $35,000 | - | - |
$8,144
-
MMBtu
|
- | - |
$20,466
-
lb
|
- | - | |
| 13 | 4.211: Consider use / purchase of bulk materials where possible | $20,964 | $25,000 | - | - | - | - | - | - | $14,724 | $6,240 | |
| 14 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $3,348 | $7,000 | - | - | - | - |
$84
-
lb
|
- | $3,264 | - | |
| 15 | 4.652: Replace existing equipment with more suitable substitutes | $4,380 | $3,000 |
$945
136
kWh
|
- | - |
$171
-
Tgal
|
- | - | $3,264 | - | |
| 16 | 4.632: Change operating conditions | $2,333 | - | - | - | - | - | - | - | - | $2,333 | |
| TOTAL RECOMMENDED | $480,693 | $1,479,520 |
$226,414
2,582,849
kWh
|
$53,475
-
kW-mo/yr
|
$84,422
-
MMBtu
|
$2,683
-
Tgal
|
$84
-
lb
|
$83,790
-
lb
|
$21,252 | $8,573 | ||
| TOTAL IMPLEMENTED | $33,383 | $15,120 |
$7,974
80,664
kWh
|
$4,043
-
kW-mo/yr
|
$3,250
-
MMBtu
|
$171
-
Tgal
|
$84
-
lb
|
$9,000
-
lb
|
$6,528 | $2,333 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs