Assessment Year | 1998 |
---|---|
Principal Product | Beef Products |
NAICS |
n/a
|
SIC | 2011: Meat Packing Plants |
Sales Range | $100 M to 500M |
# of Employees | 354 |
Plant Area |
62,552
ft2
|
Annual Production | 394,570
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $290,029 | 12,349,355 |
kWh
|
$0.023 |
Electricity Demand | $192,427 | 24,552 |
kW-mo/yr
|
$7.84 |
Electricity Fees | $4,658 | - |
|
- |
Natural Gas | $401,505 | 132,907 |
MMBtu
|
$3.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,207 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,339 | $10,895 |
$1,257
54,807
kWh
|
$1,082
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,905 | $1,750 |
$1,011
43,962
kWh
|
$894
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,424 | $820 |
$(-36.0)
(-1,465)
kWh
|
$(-38.0)
-
kW-mo/yr
|
$1,498
-
MMBtu
|
- | - | - | |
04 | 3.4151: Minimize water usage | $2,739 | - | - | - | - |
$1,074
-
Tgal
|
- |
$1,665
-
Tgal
|
|
05 | 3.4151: Minimize water usage | $5,125 | $(-6,000.0) |
$(-66.0)
(-2,931)
kWh
|
$(-245.0)
-
kW-mo/yr
|
- |
$2,132
-
Tgal
|
- |
$3,304
-
Tgal
|
|
06 | 3.1131: Use mechanical stripping methods | $675 | $2,295 | - | - | - | - | $675 | - | |
TOTAL RECOMMENDED | $14,207 | $9,760 |
$2,166
94,373
kWh
|
$1,693
-
kW-mo/yr
|
$1,498
-
MMBtu
|
$3,206
-
Tgal
|
$675 |
$4,969
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs