Assessment Year | 1997 |
---|---|
Principal Product | Custom Molded Rubber Parts |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $5 M to 10M |
# of Employees | 136 |
Plant Area |
26,000
ft2
|
Annual Production | 23,453,740
pieces
|
Production Hrs. Annual | 7,904
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,498 | 3,294,842 |
kWh
|
$0.043 |
Electricity Demand | $62,082 | 8,016 |
kW-mo/yr
|
$7.74 |
Electricity Fees | $1,980 | - |
|
- |
LPG | $8,173 | 1,079 |
MMBtu
|
$7.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,774 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,625 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,061 | $6,939 |
$5,489
127,784
kWh
|
$1,572
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7135: Install occupancy sensors | $509 | $300 |
$407
9,379
kWh
|
$102
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $529 | $172 |
$464
10,844
kWh
|
$65
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $18,685 | $32,775 |
$21,982
511,723
kWh
|
$7,068
-
kW-mo/yr
|
$(-10,365.0)
-
MMBtu
|
- | - | - | - | |
05 | 3.5313: Increase amount of waste recovered for resale | $10,747 | $27,600 |
$(-1,981.0)
(-46,014)
kWh
|
$(-1,358.0)
-
kW-mo/yr
|
- | - | - | $(-6,240.0) | $20,326 | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $717 | $15,900 |
$(-4,449.0)
(-103,458)
kWh
|
$(-3,618.0)
-
kW-mo/yr
|
- | - |
$8,784
-
lb
|
- | - | |
07 | 3.5111: Filter and reuse hydraulic oil | $1,905 | - | - | - | - |
$1,905
-
gal
|
- | - | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $39,621 | $9,000 |
$(-1,551.0)
(-36,049)
kWh
|
$(-428.0)
-
kW-mo/yr
|
- | - | - | $41,600 | - | |
TOTAL RECOMMENDED | $79,774 | $92,686 |
$20,361
474,209
kWh
|
$3,403
-
kW-mo/yr
|
$(-10,365.0)
-
MMBtu
|
$1,905
-
gal
|
$8,784
-
lb
|
$35,360 | $20,326 | ||
TOTAL IMPLEMENTED | $49,625 | $16,411 |
$4,809
111,958
kWh
|
$1,311
-
kW-mo/yr
|
- |
$1,905
-
gal
|
- | $41,600 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs