Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom Molded Rubber Parts
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $5
M
to 10
M
# of Employees 136
Plant Area 26,000
ft2
Annual Production 23,453,740
pieces
Production Hrs. Annual 7,904
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,498 3,294,842
kWh
Electricity Demand $62,082 8,016
kW-mo/yr
Electricity Fees $1,980 -
LPG $8,173 1,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,061 $6,939 $5,489
127,784
kWh
$1,572
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $509 $300 $407
9,379
kWh
$102
-
kW-mo/yr
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $529 $172 $464
10,844
kWh
$65
-
kW-mo/yr
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,685 $32,775 $21,982
511,723
kWh
$7,068
-
kW-mo/yr
$(-10,365.0)
-
MMBtu
- - - -
05 3.5313: Increase amount of waste recovered for resale $10,747 $27,600 $(-1,981.0)
(-46,014)
kWh
$(-1,358.0)
-
kW-mo/yr
- - - $(-6,240.0) $20,326
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $717 $15,900 $(-4,449.0)
(-103,458)
kWh
$(-3,618.0)
-
kW-mo/yr
- - $8,784
-
lb
- -
07 3.5111: Filter and reuse hydraulic oil $1,905 - - - - $1,905
-
gal
- - -
08 2.7243: Improve air circulation with destratification fans / other methods $39,621 $9,000 $(-1,551.0)
(-36,049)
kWh
$(-428.0)
-
kW-mo/yr
- - - $41,600 -
TOTAL RECOMMENDED $79,774 $92,686 $20,361
474,209
kWh
$3,403
-
kW-mo/yr
$(-10,365.0)
-
MMBtu
$1,905
-
gal
$8,784
-
lb
$35,360 $20,326
TOTAL IMPLEMENTED $49,625 $16,411 $4,809
111,958
kWh
$1,311
-
kW-mo/yr
- $1,905
-
gal
- $41,600 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs