ITAC Assessment: DS0095
ITAC logo
ITAC Assessment: DS0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Processed Grains
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area 25,200
ft2
Annual Production 13,500
ton
Production Hrs. Annual 4,160
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,745 2,330,012
kWh
Electricity Demand $65,304 9,480
kW-mo/yr
Electricity Fees $2,831 -
Natural Gas $35,527 7,964
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,324 $7,600 $1,348
46,600
kWh
$976
-
kW-mo/yr
- - - - -
02 2.7124: Make a practice of turning off lights when not needed $179 $53 $179
6,155
kWh
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $472 $750 $348
12,016
kWh
$124
-
kW-mo/yr
- - - - -
04 2.3212: Optimize plant power factor $1,824 $2,094 - - $1,824 - - - -
05 3.1162: Use less wasteful packaging $11,890 $4,000 - - - - $890
-
lb
$11,000 -
06 2.2511: Insulate bare equipment $13,509 $62,000 - - - $13,509
-
MMBtu
- - -
07 2.8113: Purchase gas directly from a contract gas supplier $3,982 $2,500 - - - - - - $3,982
TOTAL RECOMMENDED $34,180 $78,997 $1,875
64,771
kWh
$1,100
-
kW-mo/yr
$1,824 $13,509
-
MMBtu
$890
-
lb
$11,000 $3,982
TOTAL IMPLEMENTED $27,402 $68,147 $179
6,155
kWh
- $1,824 $13,509
-
MMBtu
$890
-
lb
$11,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs