ITAC Assessment: DS0089
ITAC logo
ITAC Assessment: DS0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Bags
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 100,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,483 11,608,441
kWh
Electricity Demand $180,090 25,404
kW-mo/yr
Electricity Fees $12,421 -
Natural Gas $100,160 31,281
MMBtu
LPG $53,964 4,833
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $7,041 $1,750 - - $7,041 - - - - - -
02 2.4221: Install compressor air intakes in coolest locations $296 $450 $261
7,620
kWh
$35
-
kW-mo/yr
- - - - - - -
03 3.4116: Meter recycled water (to reduce sewer charges) $1,298 $1,100 - - - $1,298
-
Tgal
- - - - -
04 3.5111: Filter and reuse hydraulic oil $670 - - - - - $670
-
gal
- - - -
05 3.8142: Distill contaminated solvents for reuse $8,273 $7,500 $(-806.0)
(-23,740)
kWh
- - - - $1,858
-
gal
$(-2,496.0) - $9,717
06 3.1191: Change procedures / equipment / operating conditions $41,641 $2,315 $(-452.0)
(-13,189)
kWh
$(-147.0)
-
kW-mo/yr
- - - - - $42,240 -
TOTAL RECOMMENDED $59,219 $13,115 $(-997.0)
(-29,309)
kWh
$(-112.0)
-
kW-mo/yr
$7,041 $1,298
-
Tgal
$670
-
gal
$1,858
-
gal
$(-2,496.0) $42,240 $9,717
TOTAL IMPLEMENTED $49,980 $5,165 $(-452.0)
(-13,189)
kWh
$(-147.0)
-
kW-mo/yr
$7,041 $1,298
-
Tgal
- - - $42,240 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs