ITAC Assessment: DS0073
ITAC logo
ITAC Assessment: DS0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 129
Plant Area 240,000
ft2
Annual Production 564,000
thousand feet
Production Hrs. Annual 5,200
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,658 3,925,557
kWh
Electricity Demand $78,976 10,548
kW-mo/yr
Electricity Fees $7,342 -
Natural Gas $92,177 42,104
MMBtu
LPG $3,887 56
MMBtu
Fuel Oil #2 $20,239 3,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,788

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $1,407 $400 - - - $1,407
-
Tgal
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $11,263 $340 - - $11,263
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $1,223 $6,467 $777
25,205
kWh
$446
-
kW-mo/yr
- - -
04 2.6212: Turn off equipment during breaks, reduce operating time $1,106 - $1,106
35,756
kWh
- - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $701 - $701
22,567
kWh
- - - -
06 3.4156: Use flow control valves on equipment to optimize water use $3,061 $380 - - - $1,823
-
Tgal
$1,238
-
Tgal
07 2.2135: Repair and eliminate steam leaks $19,400 $1,600 - - $17,201
-
MMBtu
$1,310
-
Tgal
$889
-
Tgal
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,117 $300 $1,117
36,049
kWh
- - - -
09 2.7261: Install timers and/or thermostats $7,618 $2,100 - - $7,618
-
MMBtu
- -
TOTAL RECOMMENDED $46,896 $11,587 $3,701
119,577
kWh
$446
-
kW-mo/yr
$36,082
-
MMBtu
$4,540
-
Tgal
$2,127
-
Tgal
TOTAL IMPLEMENTED $44,788 $11,187 $3,000
97,010
kWh
$446
-
kW-mo/yr
$36,082
-
MMBtu
$3,133
-
Tgal
$2,127
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs