ITAC Assessment: DS0071
ITAC logo
ITAC Assessment: DS0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Computers and Circuit Boards
NAICS
n/a
SIC 3571: Electronic Computers
Sales Range $1
M
to 5
M
# of Employees 482
Plant Area 262,340
ft2
Annual Production 174
thousand feet
Production Hrs. Annual 4,680
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $827,171 19,313,306
kWh
Natural Gas $81,133 15,319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,865 $9,854 $3,865
89,977
kWh
- - -
02 3.4114: Replace city water with recycled water via cooling tower $8,572 $42,350 - $4,178
-
Tgal
- $4,394
-
Tgal
03 2.8113: Purchase gas directly from a contract gas supplier $12,255 - - - $12,255 -
04 2.4221: Install compressor air intakes in coolest locations $2,703 $750 $2,703
63,013
kWh
- - -
TOTAL RECOMMENDED $27,395 $52,954 $6,568
152,990
kWh
$4,178
-
Tgal
$12,255 $4,394
-
Tgal
TOTAL IMPLEMENTED $14,958 $750 $2,703
63,013
kWh
- $12,255 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs