ITAC Assessment: GT0475
ITAC logo
ITAC Assessment: GT0475
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LEAD-ACID BATTERIES
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 2,700,000
pieces
Production Hrs. Annual 6,480
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,556,211 51,004,690
kWh
Natural Gas $105,001 27,450
MMBtu
LPG $10,063 1,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $11,700 - $11,700
233,294
kWh
-
02 2.7229: Air condition only space necessary $11,100 $9,000 $11,100
220,985
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,920 $520 $6,920
137,749
kWh
-
04 2.4133: Use most efficient type of electric motors $6,033 $170,330 $6,033
120,457
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,647 - $11,647
232,415
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,155 $7,320 $1,750
34,877
kWh
$(-595.0)
07 2.7111: Reduce illumination to minimum necessary levels $2,620 - $2,620
52,169
kWh
-
TOTAL RECOMMENDED $51,175 $187,170 $51,770
1,031,946
kWh
$(-595.0)
TOTAL IMPLEMENTED $51,175 $187,170 $51,770
1,031,946
kWh
$(-595.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs