ITAC Assessment: DS0066
ITAC logo
ITAC Assessment: DS0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Commercial Printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 475
Plant Area 385,000
ft2
Annual Production 144,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $753,529 27,139,215
kWh
Electricity Demand $342,289 51,204
kW-mo/yr
Electricity Fees $138,698 -
Natural Gas $123,638 82,267
MMBtu
LPG $9,559 2,595
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,372

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,792 $21,193 $14,938
533,705
kWh
$6,854
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $27,874 $37,150 $25,400
907,386
kWh
$(-745.0)
-
kW-mo/yr
$3,219
-
MMBtu
-
03 2.2441: Preheat boiler makeup water with waste process heat $28,580 $52,000 $(-258.0)
(-9,379)
kWh
$(-120.0)
-
kW-mo/yr
$28,958
-
MMBtu
-
04 3.4155: Meter waste water $1,464 $550 - - - $1,464
-
Tgal
TOTAL RECOMMENDED $79,710 $110,893 $40,080
1,431,712
kWh
$5,989
-
kW-mo/yr
$32,177
-
MMBtu
$1,464
-
Tgal
TOTAL IMPLEMENTED $50,372 $73,193 $14,680
524,326
kWh
$6,734
-
kW-mo/yr
$28,958
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs