Assessment Year | 1996 |
---|---|
Principal Product | Commercial Printing |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 475 |
Plant Area |
385,000
ft2
|
Annual Production | 144,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $753,529 | 27,139,215 |
kWh
|
$0.028 |
Electricity Demand | $342,289 | 51,204 |
kW-mo/yr
|
$6.68 |
Electricity Fees | $138,698 | - |
|
- |
Natural Gas | $123,638 | 82,267 |
MMBtu
|
$1.50 |
LPG | $9,559 | 2,595 |
MMBtu
|
$3.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,372 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,792 | $21,193 |
$14,938
533,705
kWh
|
$6,854
-
kW-mo/yr
|
- | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $27,874 | $37,150 |
$25,400
907,386
kWh
|
$(-745.0)
-
kW-mo/yr
|
$3,219
-
MMBtu
|
- | |
03 | 2.2441: Preheat boiler makeup water with waste process heat | $28,580 | $52,000 |
$(-258.0)
(-9,379)
kWh
|
$(-120.0)
-
kW-mo/yr
|
$28,958
-
MMBtu
|
- | |
04 | 3.4155: Meter waste water | $1,464 | $550 | - | - | - |
$1,464
-
Tgal
|
|
TOTAL RECOMMENDED | $79,710 | $110,893 |
$40,080
1,431,712
kWh
|
$5,989
-
kW-mo/yr
|
$32,177
-
MMBtu
|
$1,464
-
Tgal
|
||
TOTAL IMPLEMENTED | $50,372 | $73,193 |
$14,680
524,326
kWh
|
$6,734
-
kW-mo/yr
|
$28,958
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs