ITAC Assessment: DS0044
ITAC logo
ITAC Assessment: DS0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Livestock Feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 50,769
ft2
Annual Production 138,000
ton
Production Hrs. Annual 5,520
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,630 3,008,793
kWh
Natural Gas $33,995 15,027
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,508 $4,325 $2,508
57,737
kWh
-
02 2.7135: Install occupancy sensors $570 $400 $570
15,533
kWh
-
03 2.4133: Use most efficient type of electric motors $3,828 $15,870 $3,828
79,719
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $1,652 $170 $1,652
44,549
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $504 $290 $504
13,775
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $135 $135 - $135
-
MMBtu
07 2.2437: Recover waste heat from equipment $1,035 $2,000 - $1,035
-
MMBtu
08 2.2511: Insulate bare equipment $168 $263 - $168
-
MMBtu
TOTAL RECOMMENDED $10,400 $23,453 $9,062
211,313
kWh
$1,338
-
MMBtu
TOTAL IMPLEMENTED $8,693 $20,900 $8,558
197,538
kWh
$135
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs