ITAC Assessment: DS0043
ITAC logo
ITAC Assessment: DS0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Diagnostic Catheters, Balloon Catheters, Stents
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 194,100
ft2
Annual Production 450,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $356,124 6,987,691
kWh
Natural Gas $75,753 16,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.1213: Direct warmest air to combustion intake $540 $240 - $540
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $515 $825 $515
16,706
kWh
- -
03 2.4323: Use optimum size and capacity equipment $16,954 $1,700 - - $16,954
-
Tgal
TOTAL RECOMMENDED $18,009 $2,765 $515
16,706
kWh
$540
-
MMBtu
$16,954
-
Tgal
TOTAL IMPLEMENTED $16,954 $1,700 - - $16,954
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs