ITAC Assessment: DS0036
ITAC logo
ITAC Assessment: DS0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Toner for copiers/printers
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 208,163
ft2
Annual Production 2,100
ton
Production Hrs. Annual 6,720
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $727,784 15,993,552
kWh
Natural Gas $22,612 7,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,134 $18,540 $4,134
88,511
kWh
-
02 2.4133: Use most efficient type of electric motors $14,228 $44,797 $14,228
294,842
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,589 $13,824 $6,589
134,232
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $8,795 $4,000 $8,795
314,185
kWh
-
05 2.2437: Recover waste heat from equipment $8,187 $8,500 - $8,187
-
MMBtu
TOTAL RECOMMENDED $41,933 $89,661 $33,746
831,770
kWh
$8,187
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs