Assessment Year | 2007 |
---|---|
Principal Product | Fresh Pork Products |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2011: Meat Packing Plants |
Sales Range | $100 M to 500M |
# of Employees | 355 |
Plant Area |
250,000
ft2
|
Annual Production | 162,000,000
lb
|
Production Hrs. Annual | 2,280
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $303,775 | 8,167,320 |
kWh
|
$0.037 |
Electricity Demand | $151,045 | 24,588 |
kW-mo/yr
|
$6.14 |
Natural Gas | $761,420 | 98,816 |
MMBtu
|
$7.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,836 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,001 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,297 | $1,586 |
$3,927
105,840
kWh
|
$1,370
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,060 | $500 |
$648
17,456
kWh
|
$412
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,670 | $3,539 |
$2,177
58,692
kWh
|
$493
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,722 | $6,274 |
$4,666
125,768
kWh
|
$1,056
-
kW-mo/yr
|
- | |
05 | 2.1213: Direct warmest air to combustion intake | $4,262 | $1,500 | - | - |
$4,262
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,867 | $3,329 |
$2,976
80,210
kWh
|
$1,891
-
kW-mo/yr
|
- | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $84,655 | $36,000 | - | - |
$84,655
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $525 | $635 | - | - |
$525
-
MMBtu
|
|
09 | 2.2122: Install / repair insulation on condensate lines | $1,560 | $740 | - | - |
$1,560
-
MMBtu
|
|
10 | 2.2521: Isolate steam lines to avoid heating air conditioned areas | $2,038 | $2,236 |
$662
17,834
kWh
|
$437
-
kW-mo/yr
|
$939
-
MMBtu
|
|
11 | 2.2511: Insulate bare equipment | $2,180 | $1,563 |
$663
17,869
kWh
|
$577
-
kW-mo/yr
|
$940
-
MMBtu
|
|
TOTAL RECOMMENDED | $114,836 | $57,902 |
$15,719
423,669
kWh
|
$6,236
-
kW-mo/yr
|
$92,881
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,001 | $20,339 |
$15,056
405,800
kWh
|
$5,659
-
kW-mo/yr
|
$7,286
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs