ITAC Assessment: OR0445
ITAC logo
ITAC Assessment: OR0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Asphalt, Aggregate, STB
NAICS 212321: Construction Sand and Gravel Mining
SIC 1442: Construction Sand and Gravel
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area
n/a
Annual Production 825,000
ton
Production Hrs. Annual 535
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,182 3,238,200
kWh
Electricity Demand $91,536 21,192
kW-mo/yr
Electricity Fees $18,800 -
Fuel Oil #2 $167,283 40,136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.321: Optimize production lot sizes and inventories $123,700 $303,000 n/a - - - - $37,200 - $86,500
02 2.4133: Use most efficient type of electric motors $4,860 $5,450 $2,800
57,200
kWh
$2,060
-
kW-mo/yr
- - - - -
03 2.1113: Reduce combustion air flow to optimum $1,778 $150 - - - $2,078
-
MMBtu
- $(-300.0) -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,960 - $1,240
25,300
kWh
$720
-
kW-mo/yr
- - - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,505 - - $864
-
kW-mo/yr
$641 - - - -
06 2.3212: Optimize plant power factor $5,690 $20,000 - - $5,690 - - - -
TOTAL RECOMMENDED $139,493 $328,600 $4,040
82,500
kWh
$3,644
-
kW-mo/yr
$6,331 $2,078
-
MMBtu
$37,200 $(-300.0) $86,500
TOTAL IMPLEMENTED $6,638 $5,600 $2,800
57,200
kWh
$2,060
-
kW-mo/yr
- $2,078
-
MMBtu
- $(-300.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs