ITAC Assessment: OK0624
ITAC logo
ITAC Assessment: OK0624
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Winches
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 91,000
ft2
Annual Production 9,600
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,401 2,432,320
kWh
Electricity Fees $2,969 -
Natural Gas $10,811 2,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $344,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140,111

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7229: Air condition only space necessary $2,978 $130 $2,978
70,400
kWh
- - -
02 2.7132: Install timers on light switches in little used areas $4,484 $255 $4,484
106,808
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,627 $240 $3,867
91,420
kWh
$760
-
kW-mo/yr
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,170 $50,000 - - $1,170
-
lb
-
05 4.513: Re-arrange equipment layout to reduce labor costs $131,000 $92,000 - - - $131,000
06 4.445: Install equipment to move product $200,000 $200,000 - - - $200,000
TOTAL RECOMMENDED $344,259 $342,625 $11,329
268,628
kWh
$760
-
kW-mo/yr
$1,170
-
lb
$331,000
TOTAL IMPLEMENTED $140,111 $92,495 $8,351
198,228
kWh
$760
-
kW-mo/yr
- $131,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs