| Assessment Year | 2001 |
|---|---|
| Principal Product | Winches |
| NAICS |
n/a
|
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
91,000
ft2
|
| Annual Production | 9,600
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $127,401 | 2,432,320 |
kWh
|
$0.052 |
| Electricity Fees | $2,969 | - |
|
- |
| Natural Gas | $10,811 | 2,134 |
MMBtu
|
$5.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $344,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $140,111 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7229: Air condition only space necessary | $2,978 | $130 |
$2,978
70,400
kWh
|
- | - | - | |
| 02 | 2.7132: Install timers on light switches in little used areas | $4,484 | $255 |
$4,484
106,808
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,627 | $240 |
$3,867
91,420
kWh
|
$760
-
kW-mo/yr
|
- | - | |
| 04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,170 | $50,000 | - | - |
$1,170
-
lb
|
- | |
| 05 | 4.513: Re-arrange equipment layout to reduce labor costs | $131,000 | $92,000 | - | - | - | $131,000 | |
| 06 | 4.445: Install equipment to move product | $200,000 | $200,000 | - | - | - | $200,000 | |
| TOTAL RECOMMENDED | $344,259 | $342,625 |
$11,329
268,628
kWh
|
$760
-
kW-mo/yr
|
$1,170
-
lb
|
$331,000 | ||
| TOTAL IMPLEMENTED | $140,111 | $92,495 |
$8,351
198,228
kWh
|
$760
-
kW-mo/yr
|
- | $131,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs