| Assessment Year | 1995 |
|---|---|
| Principal Product | Snowmobile hoods |
| NAICS |
n/a
|
| SIC | 3799: Transportation Equipment, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 75 |
| Plant Area |
37,296
ft2
|
| Annual Production | 78,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | South Dakota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,919 | 1,618,992 |
kWh
|
$0.036 |
| Natural Gas | $70,088 | 16,064 |
MMBtu
|
$4.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,925 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,623 | $6,146 |
$1,623
42,204
kWh
|
- | - | |
| 02 | 3.4111: Use closed cycle process to minimize waste water production | $17,652 | $40,496 |
$4,956
28,722
kWh
|
$(-1,313.0)
-
MMBtu
|
$14,009
-
Tgal
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,356 | $17,400 | - |
$28,356
-
MMBtu
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $294 | $192 |
$294
13,189
kWh
|
- | - | |
| TOTAL RECOMMENDED | $47,925 | $64,234 |
$6,873
84,115
kWh
|
$27,043
-
MMBtu
|
$14,009
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs