ITAC Assessment: DS0034
ITAC logo
ITAC Assessment: DS0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Snowmobile hoods
NAICS
n/a
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 75
Plant Area 37,296
ft2
Annual Production 78,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,919 1,618,992
kWh
Natural Gas $70,088 16,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $1,623 $6,146 $1,623
42,204
kWh
- -
02 3.4111: Use closed cycle process to minimize waste water production $17,652 $40,496 $4,956
28,722
kWh
$(-1,313.0)
-
MMBtu
$14,009
-
Tgal
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,356 $17,400 - $28,356
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $294 $192 $294
13,189
kWh
- -
TOTAL RECOMMENDED $47,925 $64,234 $6,873
84,115
kWh
$27,043
-
MMBtu
$14,009
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs