ITAC Assessment: AM0769
ITAC logo
ITAC Assessment: AM0769
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product extruded cables
NAICS 332114: Custom Roll Forming
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 80,000
ft2
Annual Production 76,000
thousand feet
Production Hrs. Annual 6,512
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,284 962,400
kWh
Electricity Demand $19,978 2,004
kW-mo/yr
Electricity Fees $8,713 -
Natural Gas $1,311 92
MMBtu
TOTAL YEARLY COSTS $87,286
RECOMMENDED SAVINGS* $44,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $32,530 $3,000 - - $6,506 - $26,024
02 2.3212: Optimize plant power factor $4,100 $9,520 - $4,100
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,580 $6,560 $2,730
45,900
kWh
$850
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,950 $11 $1,490
25,000
kWh
$460
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,065 $500 $815
13,700
kWh
$250
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $510 $125 $85
1,430
kWh
$18
-
kW-mo/yr
- $407 -
07 2.7124: Make a practice of turning off lights when not needed $420 - $320
5,410
kWh
$100
-
kW-mo/yr
- - -
08 2.2511: Insulate bare equipment $350 $144 $270
4,550
kWh
$80
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $320 $100 $320
5,380
kWh
- - - -
TOTAL RECOMMENDED $44,825 $19,960 $6,030
101,370
kWh
$5,858
-
kW-mo/yr
$6,506 $407 $26,024
TOTAL IMPLEMENTED $7,335 $7,171 $5,675
95,390
kWh
$1,660
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs