ITAC Assessment: DS0032
ITAC logo
ITAC Assessment: DS0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plated Stones, Crests
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $5
M
to 10
M
# of Employees 93
Plant Area 42,650
ft2
Annual Production 175,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,707 1,041,032
kWh
Natural Gas $37,970 14,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,587 $8,977 $3,587
38,101
kWh
-
02 2.4133: Use most efficient type of electric motors $2,678 $3,457 $2,678
29,601
kWh
-
03 2.6218: Turn off equipment when not in use $2,608 $1,920 $939
26,964
kWh
$1,669
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $137 $360 $137
3,810
kWh
-
05 2.2426: Use waste heat from flue gases to heat space conditioning air $1,006 $2,157 - $1,006
-
MMBtu
TOTAL RECOMMENDED $10,016 $16,871 $7,341
98,476
kWh
$2,675
-
MMBtu
TOTAL IMPLEMENTED $10,016 $16,871 $7,341
98,476
kWh
$2,675
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs