ITAC Assessment: DS0020
ITAC logo
ITAC Assessment: DS0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Headsets, Earsets, MicStick/Voice Comm.
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 105,200
ft2
Annual Production 229,909
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,936 2,954,865
kWh
Natural Gas $11,559 2,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,077 $21,586 $10,077
182,591
kWh
02 2.7135: Install occupancy sensors $991 $2,006 $991
19,050
kWh
03 2.4221: Install compressor air intakes in coolest locations $1,483 $120 $1,483
28,429
kWh
04 2.4133: Use most efficient type of electric motors $3,134 $5,056 $3,134
60,375
kWh
TOTAL RECOMMENDED $15,685 $28,768 $15,685
290,445
kWh
TOTAL IMPLEMENTED $1,483 $120 $1,483
28,429
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs