ITAC Assessment: CO0001
ITAC logo
ITAC Assessment: CO0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 2,860
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,020 580,012
kWh
Natural Gas $16,456 3,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $864 $300 - $864
-
MMBtu
-
02 2.2163: Use minimum steam operating pressure $231 - - $231
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $1,145 $2,500 - $1,145
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $300 $260
4,396
kWh
- -
05 2.2444: Use hot process fluids to preheat incoming process fluids $202 $210 - $113
-
MMBtu
$89
-
Tgal
06 2.2511: Insulate bare equipment $276 $210 $276
4,689
kWh
- -
07 2.7441: Replace broken windows and/or window sash $2,085 $200 $2,073
35,170
kWh
$12
-
MMBtu
-
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,000 - $6,000
-
kWh
- -
09 2.3212: Optimize plant power factor $2,800 $1,057 $2,800
-
kWh
- -
TOTAL RECOMMENDED $13,863 $4,777 $11,409
44,255
kWh
$2,365
-
MMBtu
$89
-
Tgal
TOTAL IMPLEMENTED $11,063 $3,720 $8,609
44,255
kWh
$2,365
-
MMBtu
$89
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs