Assessment Year | 1984 |
---|---|
Principal Product | DAIRY PRODUCTS |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
n/a
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,020 | 580,012 |
kWh
|
$0.057 |
Natural Gas | $16,456 | 3,864 |
MMBtu
|
$4.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,063 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $864 | $300 | - |
$864
-
MMBtu
|
- | |
02 | 2.2163: Use minimum steam operating pressure | $231 | - | - |
$231
-
MMBtu
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $1,145 | $2,500 | - |
$1,145
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $260 | $300 |
$260
4,396
kWh
|
- | - | |
05 | 2.2444: Use hot process fluids to preheat incoming process fluids | $202 | $210 | - |
$113
-
MMBtu
|
$89
-
Tgal
|
|
06 | 2.2511: Insulate bare equipment | $276 | $210 |
$276
4,689
kWh
|
- | - | |
07 | 2.7441: Replace broken windows and/or window sash | $2,085 | $200 |
$2,073
35,170
kWh
|
$12
-
MMBtu
|
- | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,000 | - |
$6,000
-
kWh
|
- | - | |
09 | 2.3212: Optimize plant power factor | $2,800 | $1,057 |
$2,800
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $13,863 | $4,777 |
$11,409
44,255
kWh
|
$2,365
-
MMBtu
|
$89
-
Tgal
|
||
TOTAL IMPLEMENTED | $11,063 | $3,720 |
$8,609
44,255
kWh
|
$2,365
-
MMBtu
|
$89
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs