ITAC Assessment: DS0017
ITAC logo
ITAC Assessment: DS0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Packaged Feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 19
Plant Area 43,390
ft2
Annual Production 45,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,795 1,099,062
kWh
Natural Gas $3,995 644
MMBtu
LPG $21,136 7,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,154 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,912 $2,341 $1,912
31,653
kWh
-
02 2.4133: Use most efficient type of electric motors $1,821 $5,125 $1,821
24,912
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $501 $60 $501
12,603
kWh
-
04 2.2437: Recover waste heat from equipment $445 $560 - $445
-
MMBtu
05 2.2511: Insulate bare equipment $1,065 $442 - $1,065
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $225 $121 - $225
-
MMBtu
07 2.1213: Direct warmest air to combustion intake $185 $250 - $185
-
MMBtu
TOTAL RECOMMENDED $6,154 $8,899 $4,234
69,168
kWh
$1,920
-
MMBtu
TOTAL IMPLEMENTED $6,154 $8,899 $4,234
69,168
kWh
$1,920
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs